PRODUCT · BY INTELLAQ FLOW

Tender Mind AI

The construction ERP in Saudi Arabia built for general contracting companies.

Tender to final account in one system — with AI that reads the tender pack, extracts the BOQ, prices it against your own historic rates and flags the clauses that will cost you later.

−62%
time from tender receipt to submitted bid
SAR 2.1M
variation orders recovered on one project
14
Saudi contractors live on it today

The problem

Contractors don’t lose money on site. They lose it in the paperwork around the site.

Bids priced on guesswork

Two weeks to read 400 pages, so the BOQ gets priced from memory and last year’s rates.

Variations never claimed

Instructions arrive by WhatsApp, get built, and never make it into a certified claim.

Cash trapped in IPCs

Progress claims built in Excel, rejected on a technicality, re-submitted a month later.

No live cost position

The real margin on a project is known at the final account — eighteen months too late.

The AI part

It reads the tender before your estimators do.

Upload the tender pack — Etimad download, PDF drawings, specification, BOQ in any format. Tender Mind AI returns a structured, priced, risk-flagged bid position in hours, in Arabic or English. Your estimator reviews and overrides; the system learns the corrections.

What the AI does inside a construction ERP in Saudi Arabia

01

BOQ extraction

Every line item, quantity and unit pulled out and matched to your cost library.
02

Rate suggestion from your history

Priced off what the item actually cost you on past projects, not a market table.
03

Risk clause flagging

Liquidated damages, retention terms, payment periods and scope gaps surfaced with page references.
04

Win-probability read

Scored against your bid history so you can walk away from the tenders you never win.
tendermind.ai · bid 2026-114
Riyadh Health Cluster — Phase 2
Etimad · 412 pages · parsed in 3h 41m
READY FOR REVIEW
BOQ lines
1,847
Priced value
SAR 214M
Win probability
41%
Risk flags
HIGH
LD capped at 15% — above your usual 10% ceiling
Conditions · CL 8.7 · P.148
MED
Payment period 90 days from certification
Conditions · CL 14.7 · P.161
MED
MEP scope gap between spec and drawing set
Spec 23 05 00 vs DWG M-204

Every module a construction ERP in Saudi Arabia needs

Start with tendering and cost control. Add the rest as the rollout moves through your business.

01

Tender & bid management

AI parsing, bid register, Etimad tracking, go / no-go scoring.

02

Estimation & BOQ

Cost library, build-ups, subcontractor comparison, markup control.

03

Cost control

Budget vs committed vs actual, earned value, forecast at completion.

04

Subcontractors

Packages, back-to-back terms, performance scoring, payment certificates.

05

IPCs & retention

Progress measurement, claim generation, retention release tracking.

06

Variation orders

Site instruction capture, pricing, approval trail, claim status.

07

Plant, stores & procurement

Equipment utilisation, material requisitions, purchase orders, deliveries.

08

HR, payroll & compliance

Labour allocation to cost codes, GOSI, Qiwa, Mudad, ZATCA e-invoicing.

Inside the system

Project cost control, live

One screen the commercial manager and the owner both trust — because it is built from committed costs, not a monthly report.

tendermind.ai · projects / RYD-Tower-P2AR / EN
Riyadh Tower — Phase 2
Main contract · month 14 of 26 · Rabi' II 1448
To dateCost report
Contract value
SAR 186M
+ SAR 9.2M variations
Cost to date
SAR 104M
58% of budget
Forecast margin
11.4%
▼ 1.8 pts vs tender
Retention held
SAR 9.3M
first release at handover
Certified vs cost, by month
CertifiedCost
Progress by package
Structure96%
Façade71%
MEP48%
Finishes22%
MEP is 14% behind programme — three subcontractor claims pending.
Variation orders
6 pending · SAR 4.1M
VODescriptionValueRaisedStatus
VO-018Basement waterproofing spec upgradeSAR 1,840,000M12Approved
VO-019Additional chillers, levels 8–12SAR 2,260,000M13With engineer
VO-020Lobby stone substitutionSAR 640,000M14Pricing
VO-021Site accommodation extension, 4 monthsSAR 312,000M14Disputed

Rollout in one quarter

We start on one live project, not the whole company. Your team is bidding through it inside six weeks.

Weeks 1–2

Map & import

Your cost codes, rate history, subcontractor list and one live project.

Weeks 3–6

Bid live

Estimators run a real tender through the AI alongside their normal process.

Weeks 7–10

Cost control on

Commitments, IPCs and variations move into the system for that project.

Weeks 11–13

Scale & hand over

Remaining projects, HR and ZATCA switched on. Your admins trained to configure it.

Book a demoOther industriesLicensed per project and per user · hosted in-Kingdom